Categories
News Transportation

Expert Panel to Discuss Bus Rapid Transit, Bikeway Planning in Cincinnati on 4/19

The Cincinnati region is rethinking the way it moves people and goods throughout the region with major investments and studies taking place on bus rapid transit, bikeways, and multi-modal corridors. The Cincinnati region will evolve, for better or worse, depending on how these investments are planned.

To help further this discussion, we are proud to announce a new partnership between the Niehoff Urban Studio and UrbanCincy that will focus on the work produced by students at the interdisciplinary design center.

The exhibits produced by the students will be judged by those in attendance at the planned semi-annual events, and followed by an expert panel discussion. The best student project will then be profiled on UrbanCincy.

Metropolis & Mobility: Bus Rapid Transit and Bikeways

The first event of the new partnership, Metropolis & Mobility: Bus Rapid Transit and Bikeways, will take place on Friday, April 19, and will include discussion about how multi-modal transportation concepts can be applied throughout Cincinnati.

The expert panel will include Southwest Ohio Regional Transit Authority CEO Terry Garcia-Crews, Cincinnati Bike Center manager Jared Arter, and Parsons Brinckerhoff transportation planner Tim Reynolds.

“Bus rapid transit is a new form of urban transport, already in place in many American cities that can be modeled for Cincinnati to put us one step closer to a much-needed rapid regional transit system,” explained Niehoff Urban Studio director Frank Russell.

Russell goes on to say that the discussion regarding bikeway planning will focus on three new proposals for the Mill Creek Greenway, Western Riverfront Trail, and the Wasson Way.

The event is free and open to the public, and will include an open house session from 5pm to 6pm where visitors can view the student exhibits and mingle with the panel, and the panel discussion itself from 6pm to 7:30pm.

There will be a cash bar and complimentary light snacks provided for those in attendance.

The Niehoff Urban Studio is located at 2728 Vine Street in Corryville. The event is easily accessible via Metro bus service, and $1 parking will be available at the 2704 parking structure accessible from Vine Street.

Categories
Business Development News Transportation

Cincinnati Proposes Eliminating Parking Requirements in Downtown and Over-the-Rhine

The City of Cincinnati will hold a public conference this evening about proposed amendment to the zoning code that would deregulate parking requirements throughout the center city.

According to city officials, the amendment would create new ‘Urban Parking Districts’ and remove the current regulations that mandate how many parking spaces must be provided for any new development or for any project that is modifying the use of an existing structure.

The efforts to get rid of the parking requirements throughout the center city have been ongoing for years.

In June 2010, city officials moved forward with new legislation that allowed for a 50% parking reduction for residences located within 600 feet of a streetcar stop. Then in March 2012, Vice Mayor Roxanne Qualls (C) introduced a motion, which was co-sponsored by six other council members, to eliminate all parking requirements throughout the Central Business District and Over-the-Rhine.

Over-the-Rhine
Over-the-Rhine’s existing historic fabric is at risk of further demolitions, due to current parking requirements, as investment continues to pour into the neighborhood. Photograph by Randy Simes for UrbanCincy.

Last March, UrbanCincy examined just how these off-street parking mandates are stifling growth and investment in the center city, which was largely built before the advent of the automobile. The requirements have led to not only increased costs for small businesses, but they have also led to an excess of parking in these neighborhoods.

The parking regulations also make it particularly difficult to redevelop smaller historic buildings like the ones found throughout Over-the-Rhine.

“Requiring parking for historic structures that have never had parking is incentivizing their demolition. This puts the property owner in a really difficult position; he must either find parking for the building, demolish it or let it languish in perpetuity.” Nashville city planner, Joni Priest, told UrbanCincy last March. “If a property owner wants to rehab an historic building – a building that marks the character of a neighborhood and contributes to the fabric of the city – all incentives, including the elimination of parking requirements, should be considered.”

Parking requirements have also contributed to the increased costs of redevelopment in these historic neighborhoods.

Last April, Chad Munitz, Executive Vice President of Development and Operations of the Cincinnati Center City Development Corporation (3CDC), estimated that existing parking mandates cost developers, on average, $5,000 for one surface parking space and $25,000 for a structured parking space. The increased cost associated with that parking, Munitz says, is then passed on to the consumer and raises the price of a residential unit by as much as $25,000.

The City of Cincinnati’s Planning & Buildings Department will host the public conference this evening at 5:30pm at Two Centennial Plaza, which is located at 805 Central Avenue downtown, and is well-served by a number of Metro bus routes (plan your trip). City officials say that the meeting will take place on the 7th floor, Suite 720 in the Martin Griesel Room A.

Categories
News Politics Transportation

Ohio Fails to Show Improvement in Latest Infrastructure Report Card

We take for granted that bridges, roads, highways, water treatment facilities and dams will function as expected and take us to where we need to go. But our nation’s aging infrastructure has long been in decline as money is diverted from maintenance to construction of new projects, many times for politicians eager for the photo op of a ribbon cutting event.

Recently, the American Society of Civil Engineers (ASCE) released its latest report on the current state of the nation’s infrastructure. The last such report, issued in 2009, had given the country a rating of D. This year’s report showed the nation’s rating had improved to a D+ grade.

“Our country’s association of civil engineers continues to do the yeoman’s work of sounding the alarm on our country’s infrastructure — the roads, rails and waterways that we depend on to move our goods from place to place and get us where we need to go each day,” James Corless, Director of Transportation For America (T4A), stated in a prepared release.

I-75 Reconstruction
Work on the multi-billion dollar repair and widening of I-75 through Cincinnati proceeds, but the project still has yet to receive the full funding it needs to be completed. Photograph by Jake Mecklenborg for UrbanCincy.

As the nation sifts through a backlog of infrastructure replacement projects, national policy has shifted away from funding such critical infrastructure needs as budgetary concerns linger.

The current transportation bill, Moving Ahead for Progress in the 21st Century (MAP-21), offers no new funding for investments in transportation alternatives to relieve congested corridors or encourage smart solutions to these complex problems.

“It’s a sad reality that little has changed since the last report card in 2009,” Corless continued. “Has anything in Washington changed to drastically improve the condition of our roads, bridges and transit systems in the four years since?”

Without new revenue sources, Corless says, the funding problem is only poised to get worse as revenues continue to decline from the federal gas tax, which has not been raised since 1993. Such a lack of necessary revenues may soon leave the federal government unable to perform basic infrastructure maintenance.

Local Implications?
In both 2009 and 2013, the ASCE gave Ohio a C- grade in their infrastructure report card. While the grade places Ohio ahead of the national average, it still translates to 2,462 structurally deficient bridges and approximately 42% of its roadways in “poor” or “mediocre” quality.

While the State of Ohio raised its gas tax in 2006, the extra revenues have not been enough to keep pace with the demand for larger transportation projects like the expansion of I-75 through Cincinnati, the  Brent Spence Bridge project, and the long-planned MLK Interchange project, which all currently stand unfunded or only partially funded.

“Some other states aren’t waiting for billions that are unlikely to come and are thinking about ways to make their dollars do more. Like Massachusetts, where the DOT director issued a goal of tripling the number of trips taken by foot, bike and public transportation — reducing the load on roads and bridges that are among the oldest in the country,” explained Stephen Lee Davis, T4A’s Deputy Communications Director.

Ohio Infrastructure

The City of Cincinnati has been working towards improving some of its worst-rated infrastructure since the last report card was issued in 2009. Since that time, Cincinnati’s Department of Transportation & Engineering (DOTE) has performed a $22 million rehabilitation of the W. Eighth Street Viaduct and is in the midst of a $55 million replacement of the Waldvogel Viaduct which connects the west side with the center city via the Sixth Street Expressway.

Additionally, Cincinnati’s 3,500-foot-long Western Hills Viaduct also is considered structurally deficient. Replacing a span that is nearly twice as long as the longest Ohio River span, and crosses the Midwest’s second busiest rail yard, will be one that is both difficult and costly.

Cincinnati officials say that they are currently studying whether a rehabilitation of the existing 82-year-old, double-decker viaduct or a replacement will be more appropriate.

“That is one of those kind of icons in the Mill Creek Valley that you like to look at,” noted Michael Moore, Cincinnati’s DOTE Director, on The UrbanCincy Podcast. “But we will need to be very cognizant of how we spend the public’s money in making sure we have a good safe mode to get across that area.”

Moore says that the department hopes to wrap up the study on how to fix the Western Hills Viaduct early this spring. Once that is complete, he says that there will be a good idea on how to accomplish that. Where the funding might come for such a large project, however, is still up in the air.

Categories
Business Development News Opinion Transportation

Portland Aims to Replicate Streetcar Success on East Side of Willamette River

Six months ago Portland celebrated the opening of a 3.3-mile extension of their modern streetcar system across the Willamette River.

The $148.3 million Portland Streetcar project represents a significant expansion of the existing six-mile system, and city leaders hope it will find similar success in the Lloyd District, Buckman and Hosford-Abernethy neighborhoods as it has in the Pearl District and Northwest District.

At the time when Portland built its first streetcar leg, the Pearl District was a rundown industrial district in search of new life, and the Northwest District was looking to build on its existing stability.

Pearl District Buckman Neighborhood
Portland’s Pearl District [LEFT] has seen a massive transformation over the past decade, and many hope the streetcar’s recent extension will do the same for the city’s Buckman neighborhood [RIGHT]. Photographs by Randy Simes for UrbanCincy.

The story is not all that different on the east side of the river where the Buckman and Hosford-Abernethy neighborhoods are looking for the streetcar to breathe new life into its underutilized land and lingering industrial users, and the Lloyd District is trying to build on its successes and possibly reinvent itself with a lesser focus on the automobile.

While the streetcar extension is operating daily, the investments are not quite finished. Transportation officials are waiting on an additional six streetcar vehicles to roll off the production line so that service frequencies can be improved for the system’s four million annual riders.

TriMet officials are also overseeing progress on the construction of the new Portland-Milwaukie Bridge which will provide a river crossing for bicycles, pedestrians, streetcars, and light rail from Hosf0rd-Abernethy to the South Waterfront District as part of a the 7.3-mile Portland-Milwaukie Light Rail Project.

The $134 million bridge project is expected to open in September 2015 and buoy both new and existing ridership on the city’s light rail and streetcar systems.

Portland-Milwaukie Light Rail Bridge South Waterfront District
Construction progresses on the Portland-Milwaukie Light Rail Bridge in November 2012 [LEFT], which will connect the Hosford-Abernethy neighborhood with the South Waterfront District [RIGHT]. Photographs by Randy Simes for UrbanCincy.

The verdict is still out on whether or not the new east side streetcar extension will have as big of an impact as it did on the west side of the river next to downtown, but the possibilities are there.

The streetcar’s alignment through Buckman and Hosford-Abernethy heads south along Martin Luther King Boulevard and north a block over on Grand Avenue. To the west of MLK Boulevard is the river with a large collection of warehouses in between. To the east of Grand Avenue is an in-tact neighborhood that has become increasingly popular with young creative types over the past several years.

In between the two streets one will find a collection of aging car dealerships and associated service businesses that date back to the mid-twentieth century.

These large parcels, combined with the large warehouse properties immediately to the west, offer a unique opportunity for large scale redevelopment. Such massive real estate investment might not be plausible without another real estate bubble.

The prospects are there, however, and if Portland can pull off even a fraction of the investment in Buckman as they saw in the Pearl District, then the city will add billions of dollars to its real estate value and create a secondary downtown in the city center for the 2.2 million person region.

Categories
News Transportation

City of Cincinnati to Implement Safety Improvements for Pedestrians

The City of Cincinnati will be working to improve its pedestrian crossings over the coming years in order to align with recently updated state and federal standards.

The Manual of Uniform Traffic Control Devices (MUTCD) was updated in late 2009 and includes new best practices for pedestrian crosswalk designs.

The old standard accepted the typical parallel lines seen throughout most of the city today, but the new MUTCD calls for what traffic engineers call “continental” crosswalk markings, which feature two-foot-wide yellow or white stripes. The new MUTCD also calls for the implementation of countdown pedestrian signals where the pedestrian change interval is greater than seven seconds.

Traditional Intersection Design at Seventh & Walnut
The intersection of Seventh and Walnut Streets downtown represents both the old standard for crosswalk markings and signals. Photograph by Randy Simes for UrbanCincy.

According to Cincinnati’s Department of Transportation & Engineering (DOTE), continental crosswalk markings have not yet been phased in throughout the city, but that as intersections are improved the City is working to upgrade both the pedestrian signals and crosswalk.

“The parallel markings were, at one time, considered “the standard” for crosswalk markings,” Michael Moore, Director of Cincinnati’s DOTE, told UrbanCincy. “However, with the update of the MUTCD in late 2009, best practices established the continental makings as a preferred design.”

The new continental markings are seen as a safety improvement for both pedestrians and drivers as they make crosswalks more visible, thus reducing collisions between automobile drivers and pedestrians.

The new markings, however, do pose some installation and maintenance issues for local governments.

Continental Crossing at Smale Riverfront Park
The mid-block crossing, connecting Smale Riverfront Park with The Banks, on Mehring Way features a continental crossing design. Photograph by Randy Simes for UrbanCincy.

“We place most of our markings with thermoplastic because of its durability and reflectivity; however when wet, it can be slippery,” Moore explained. “And because the continental markings require more paint or thermoplastic, they cost more to install, and more to maintain since more of the stripe is in-line with the traffic flow.”

In order to help save taxpayer dollars, Moore says that the City studies where exactly to place the markings so that they avoid the most common path of wheel travel.

Crosswalk signals with countdown timers, meanwhile, have become more popular throughout the United States since cities like Washington D.C. began testing them years ago. Locally, both Covington, KY and Newport, KY have had these timers in use in their downtowns for years.

In addition to these new countdown timers at crosswalks, the time signals allow for pedestrians to cross the street may also soon be changing. Cincinnati officials say they will be adjusting pedestrian signals to accommodate the region’s aging population.

“Where the previous timing assumed pedestrians travel approximately 4 feet per second, the new manual reduces that to 3.5 feet per second,” noted Moore. “It doesn’t sound like a lot, think about the number of large intersections we have.”

There is no set timing on these upgrades, but Cincinnati officials say that more and more crossing signals will be changed out over the coming years, and that crosswalk markings will change as intersection upgrades are performed. Cincinnatians can already see the new continental markings in place a non-signalized, mid-block crossings.