Cincinnati's Music Hall will close in May 2016 to undergo a $129 million renovation.
As the winter comes to an end, work has begun or will soon begin on a number of new developments around Over-the-Rhine. Today, we’re sharing 16 panoramas, taken over the past month, that show how the neighborhood is evolving. You can click on each of the images to view them full-screen and read the full description about each project.
3CDC will soon start work on the 15th and Vine development. The historic buildings will be saved and the parking lots will be filled with new construction.
This parking lot will be replaced by a new office building as part of Mercer Commons Phase IV.
The 15th & Race site is being developed by 3CDC. The first phase includes a new 3-story building featuring 17 condos and 2-3 commercial storefronts.
The 15th & Race site is being developed by 3CDC. The first phase includes a new 3-story building featuring 17 condos and 2-3 commercial storefronts.
This old firehouse will be rehabbed as part of the Elm Street Townhomes project.
The Ensemble Theatre Cincinnati will soon start a renovation of its buildings on the 1100 block of Vine Street, which will include the construction of a new building in the gap near the center of this photo.
Developers have proposed a nine-story building for this site on Central Parkway, replacing this now-vacant two-story office building once occupied by the Cincinnati Metropolitan Housing Authority. The new building would include 40,000 square feet of retail space (potentially a grocery store), 70,000 square feet of office space, and 235 parking spaces.
The former Drop Inn Center homeless shelter has now been demolished and will be replaced with a new theater for the Cincinnati Shakespeare Company. To the left is the Central Parkway YMCA, which is undergoing renovation. To the right is The Transept, a recently-opened bar and event space in a former church.
The corner of 12th and Elm was previously home to the Drop Inn Center. The non-historic building was demolished and will be replaced by a new theatre for the Cincinnati Shakespeare Company.
The former Ophthalmic Hospital and Free Dispensary will soon be developed into a boutique hotel featuring 20 guest rooms and a bar and restaurant on the first floor.
Cincinnati’s Music Hall will close in May 2016 to undergo a $129 million renovation.
The skywalk linking Music Hall to the Town Center Garage is expected to be demolished during the renovation of Music Hall.
The former Queen City Radio building (left) is being redeveloped by Urban Expansion, and Grandin Properties plans to convert the historic Strietmann Biscuit Company building (center) to an 88,000 square foot office building.
It looks like some preliminary interior demolition work is going on inside the historic Wielert’s building, although no plans have officially been announced.
This corner could look very different in a few years if the proposed Liberty Street Road Diet and LibertyElm project (left) move forward.
Editor’s note: These photos were taken by Travis Estell for UrbanCincy between February 11 and March 8, 2016.
Nearly three-and-a-half years have passed since that time, but it is now becoming clear that 3CDC has largely lived up to the promises they made at the time.
When first criticized by UrbanCincy, 3CDC noted that the spaces at the Mercer Commons Garage were meant not only for the $50 million Mercer Commons development, but also the office space at the Paint Building, Cintrifuse, and former Boss Cox building. In total, 3CDC’s former Vice President of Development, Adam Gelter, estimated that those projects alone would need 90 to 100 spaces.
Rendering of Fifteenth & Vine [Provided]
Section of Fifteenth & Vine [Provided]
Rendering of Fifteenth & Vine [Provided]
Rendering of Fifteenth & Vine [Provided]
In addition to that, 3CDC’s previous plans for the former Smitty’s site called for 30 to 40 residential units, which would also have their parking provided for at the Mercer Commons Garage. Since that time, those plans have evolved, and 3CDC is now proposing a 55,000-square-foot office and retail building, which, by law, would require 155 parking spaces – much more than would have been required under the previous residential scheme.
City officials say that a potential 77-space reduction may be permitted due to the existence of the nearby Mercer Commons Garage and Washington Park Garage, which have an availability of 141 and 14 spaces, respectively.
Should 3CDC pursue to utilize those two garages to their fullest extent, then it would be feasible for the non-profit development organization to avoid providing any parking at all in the $16 million project slated for the southwest corner of Fifteenth and Vine Streets.
In addition to being located to two nearby parking garages, this site is directly across the street from a Kroger grocery store, located a block away from the Cincinnati Streetcar’s first phase, and within blocks of several Red Bike stations.
With a Walk Score of 96 out of 100 points, the proposed unnamed development at Fifteenth and Vine Streets boasts one of the most walkable locations in the region.
If all goes according to plan, and 3CDC is granted their zoning variances by City Hall, then project officials say they hope to begin construction as soon as possible, with a project completion scheduled for mid-2017.