Categories
Development News

University of Cincinnati Selects Design Team for New Lindner College of Business

On December 18, the University of Cincinnati announced that its new $100-135 million Carl H. Lindner College of Business facility would be designed by the Danish firm Henning Larsen Architects in association with Cincinnati-based KZF Design. The final building is expected to be paid for through a combination of private donation and university funds.

This continues the university’s Signature Architecture Program, in which renown architecture firms from around the world are selected to design new buildings on campus, typically with a local firm serving as the architect of record. In such an arrangement, the design architect typically leads the project from concept through the design development stage, in which the overall design intent for the building is established.

The architect of record (also sometimes known as the executive architect) then carries the project through construction documents and construction administration, assuming responsibility for the technical aspects of the project. Each party typically has some involvement over the entire course of the design and construction process, but the architect of record remains legally responsible for the project, including compliance with applicable building codes.

This arrangement is common when the project is located outside the design architect’s own geographic region, and/or if the project type is outside the design architect’s usual area of expertise. For example, New York-based Architecture Research Office recently collaborated with Heery International, an Atlanta-based firm with a strong portfolio of athletic facilities, on the design of the new West Pavilion at Nippert Stadium.

Founded in 1959, Copenhagen-based Henning Larsen Architects has a long history of innovative design for educational facilities throughout the world, particularly in Europe and the Middle East. Recent projects include Campus Kolding at the University of Southern Denmark, and the Copenhagen Business School in Porcelænshaven, Frederiksberg. Common to all of Henning Larsen’s projects are a strong emphasis on transparency, natural daylighting, and an environment that nurtures a spirit of open collaboration.

Cincinnati-based KZF Design was founded in 1956 and has become one of Cincinnati’s most venerable architecture firms. KZF has a well-established history of serving as architect of record on a number of notable projects at UC, including the Campus Recreation Center in association with Morphosis and the Engineering Research Center in association with Michael Graves.

KZF was also the architect of record on Zaha Hadid‘s Contemporary Arts Center in downtown Cincinnati, and was responsible for the re-cladding of the Aronoff Center at UC, home to the College of Design, Architecture, Art, and Planning.

Henning Larsen and KZF had been shortlisted for the College of Business project in early December, along with Foster + Partners and Feilden Clegg Bradley Studios, both based in the United Kingdom.

To be built at the current site of the Myers Alumni Center and unused faculty club building, the planned 250,000- to 275,000-square-foot is anticipated to house most all of the facilities for students and faculty at the fast-growing college. Unclear at this point is the fate of the 1,601-space Campus Green Garage located immediately adjacent to the existing Lindner Hall, which is expected to be demolished once the new building is completed.

Should both be demolished, it would open up a vast space for potential construction for other uses – serving as a masterstroke of campus redevelopment that would provide much-needed classroom space, while also opening up UC’s main campus to Burnet Woods and ridding main campus of one of its most unsightly above-ground parking structures.

Categories
Arts & Entertainment News

Over-the-Rhine Exhibit Offers Place-Based Look At Neighborhood’s Past

Internet forums often serve as a popular location for people to share historical photos of the cities they love, but a new project from a People’s Liberty grantee is bringing that historical looking glass to the streets of Over-the-Rhine.

Anne Delano Steinert, a doctoral student at the University of Cincinnati studying urban and public history, says that she came up with the idea after enjoying place-based historical projects elsewhere – including Jay Shell’s rap lyrics project in New York City, RepoHistory’s work on Civil Disturbances (1998-1999) and Queer Spaces (1994), and The Museum in the Streets in Hastings-On-Hudson, New York.

The idea she employs is simple. She posts historical photos in public places to contrast what that view looked like generations ago. Her initial effort has focused on Over-the-Rhine, but has the possibility of expanding to other places depending on funding and demand.

The project, called Look Here!, is already offering a refreshing analog experience in a city so often defined by tech and digital communications. It is even more beneficial due to the fact that it is equally available for all to experience, regardless of income or access to technology.

“I strongly believe that all of us, regardless of age, class, or training have the ability to read the built environment as a way to enrich our understanding of the past,” Steinert explains. “As a result, I have chosen to post only historic photographs without informational text. The exhibit relies on you to read the photographs, ask questions and make meaning for yourself.”

Steinert says that she hopes this exploration leads people to conduct their own additional exploration and research. She also hopes that it serves as a bridge between the established residents of the historical neighborhood, and the many newcomers.

“The rapid change happening in Over-the-Rhine makes it an ideal location for the exhibit,” Steinert says. “As buildings are rehabilitated and new users join long-established residents, it is important to root the present in an understanding of the past. As the neighborhood evolves, this exhibition will allow Cincinnatians to make connections between the past and the present.”

The 69 exhibits positioned throughout Over-the-Rhine are planned to stay in place through March 2016.

EDITORIAL NOTE: All 17 photographs were taken by Eric Anspach for UrbanCincy in December 2015.

Categories
Business News

Taste of Belgium To Open Sixth Location At Phase II of The Banks

With construction expected to wrap up on the second phase of The Banks this coming spring, the development team is celebrating the signing Taste of Belgium as the first retail tenant inside the $67 million project.

After getting his start modestly in 2007 in the back of a produce shop at Findlay Market, Jean-François Flechet has grown Taste of Belgium into a household name regionally. The location on the central riverfront will be Flechet’s sixth, and one of its largest.

“The Banks has been such an important catalyst in the resurgence of downtown Cincinnati,” Flechet told UrbanCincy. “We’re thrilled our locally-owned restaurant will be front and center in the new phase of the development.”

The announcement comes at a time when things are picking up pace at The Banks. Construction work has begun on the new AC Hotel, and infrastructure work has commenced for the third phase of the project.

The Radius

Once complete in spring 2016, phase two will be home to an estimated 2,000 employees at General Electric’s 338,000-square-foot Global Operations Center and 300 new apartments. There will also be approximately 20,000 square feet of street-level retail, of which Taste of Belgium will occupy 4,800 square feet.

Over the years since getting started, Flechet has positioned himself as an outspoken small business advocate, and has been vocal in his support of inner-city development and the improvement of urban mobility through projects like the Cincinnati Streetcar and Red Bike – both of which are located a block from this new location. Due to this passion, Flechet says this location at The Banks just makes total sense.

“Cincinnati has responded so positively to our waffles and one-of-a-kind dining experience and this new venue – right in the heart of the riverfront – will have that same great energy and atmosphere.”

The move also is a nod to the growing preference for local businesses over national chains. In fact, the first phase of The Banks largely relied on national chains to fill out its retail space. But due to changing demographics and consumer trends, Marc Fallon at JR Anderson, who put this deal together, believed that The Banks would be better suited with an establishment like Taste of Belgium.

“Taste of Belgium is a great local success story and Jean-François is a great example of the kind of visionary entrepreneur driving so much of our regional growth,” said Dan McCarthy, project executive for Carter, The Banks’ master developer.

Like its other locations, Flechet says that Taste of Belgium at The Banks will be open seven days a week, serving breakfast, lunch and dinner, along with weekend brunch and unique wine lists and beer selections. There will also be a private dining room, chef’s table and a patio with outdoor dining.

“With all the excitement around our Radius residential community and the new GE office building, we needed a dynamic retail tenant that would appeal to all the new people who will be living and working at The Banks,” McCarthy added. “Taste of Belgium more than fits the bill.”

Categories
Business News Transportation

Metro To Break Ground on $1.2 Million Oakley Transit Center Next Summer

At its 2015 State of Metro meeting on Friday, Dwight Ferrell announced that the region’s largest transit agency will be build a new transit center in Oakley, along with a variety of other transit improvements in the immediate area.

The $1.2 million project will get started next summer and be built along the Isben Avenue, just east of Marburg Avenue. The location is in the middle of an area that has been completely transformed over the past two decades, including such projects as Center of Cincinnati and Oakley Station.

The project is part of a larger effort by Metro to overhaul its regional bus system from a traditional hub-and-spoke model, which focused on moving people in and out of the center city, to one that has more flexibility and connects more people, more directly, with job centers throughout the region.

“We are always looking ahead and planning for the future needs of this community,” SORTA Board Chair Jason Dunn said in a prepared statement. “Our goal is to continue to operate efficiently while constantly working to improve service.”

This particular project directly addresses the new vision for Metro by significantly enhancing transit service to an estimated 7,100 jobs in the nearby area, major shopping destinations and the Crossroads megachurch. It also builds on other recent transit hub projects like the Glenway Crossing Transit Center and Uptown Transit District, and the planned Northside Transit Center and Walnut Hills Transit District.

Metro officials say that the Oakley Transit Center will consist of four boarding bays, park-and-ride spaces for commuters, enhanced transit shelters and wayfinding, real-time arrival screens, and a ticketing kiosk like those at Government Square and the Uptown Transit District.

As of now, the improvements made as part of the Oakley Transit Center will immediately improve service for routes 4, 11, 12X, 41 and 51.

While Metro has stated that they are currently short on capital funding for upgrading their fleet, the funds for this project were provided by the Federal Surface Transportation Program, along with some local funds.

Categories
Development News Transportation

Alternatives For Liberty Street Reconfiguration Improvements Vary Widely

Following a public meeting at the Woodward Theater on November 18, Cincinnati’s Department of Transportation and Engineering is asking for feedback on the latest proposed alternatives to potentially narrowing the seven-lane, 70-foot-wide road corridor.

At the meeting, City staff provided drawings for seven alternatives to the existing design. Drawings included configurations for two-, four- and seven-lane configurations of the street, along with commentary on the pros and cons of each.

The two- and four-lane configurations would give a certain amount of space back to property owners along the south side of the street, thus increasing the development potential of some corner lots. Only a few of the seven-lane configurations included bicycle lanes on each side of the street, while others sacrificed some on-street parking to make way for bike lanes.

At the public meeting, neighborhood residents raised concern about the impact of through traffic and trucks on the street. In particular, the concern was that the street is too wide and acts as a barrier for pedestrians.

The Over-the-Rhine Brewery District, which has been the leading group pushing for this project, asked at the public meeting why the reconfiguration developed as part of their Master Plan was not included. After some consideration, City Hall has since added an alternative based on the Brewery District’s concept that included a three-lane road configuration with protected bike lanes on each side.

The proposed narrowing of Liberty Street, which was originally built as a 25-foot-wide neighborhood street, is seen by many as an opportunity to bridge the physical and psychological divide between the northern and southern portions of Over-the-Rhine.

“Minimizing the number of lanes on Liberty Street is important so the neighborhood can take over the streets,” Jean-Francois Flechet, owner of Taste of Belgium, commented after the public meeting. “I think it is important to have development on the south side, but we should also accommodate bicycles.”

Allowing for new development, while also accommodating bicycles and preserving on-street parking seems to be the biggest challenge currently facing the project. At some point, one of the items will have to give.

“I bike on Liberty Street, but I bike everywhere, and the majority of people would not find this comfortable,” Flechet continued. “I have never done it during rush hour, and I cannot imagine this would be any fun.”

City officials are accepting public comment on the various alternatives until Wednesday, December 16. The city has posted the alternatives and a public feedback form has been posted on their website. Once the public comment period is closed, City staff says they will narrow the number of alternatives down to two, and recommend one to proceed to final design.

There is currently no funding identified to implement any of the alternatives, but City officials hope to secure the necessary funds at a later date.