Categories
Transportation

PHOTOS: Cincinnati Bell Connector Gives 50,000 Rides Opening Weekend

The much-awaited Cincinnati Bell Connector opened to the public on Friday, September 9, and gave over 50,000 rides during its grand opening three-day weekend.

Councilwoman Amy Murray, who serves as Chair of the Major Transportation and Regional Cooperation Committee, hosted the grand opening ceremony at Washington Park. In addition to Murray, there were 12 speakers including current and former politicians, transit officials, and business leaders. Many of the speakers thanked the streetcar supporters who kept the project going over the years as it faced obstacle after obstacle. Several used the opportunity to call for an expansion of the system, with former mayor Mark Mallory saying that it’s not a question of “if,” but “when” and “where” the streetcar goes next.

After the first five ceremonial rides, the Connector opened to the public around noon. It was free to ride all weekend thanks to donations from Believe in Cincinnati, streetcar manufacturer CAF, Cincinnati Bell, Fred Craig, the Haile Foundation, and Joseph Automotive Group. Each station was staffed with volunteers who helped inform riders about the how the system works, where it goes, and how to pay your fare after the start of revenue service. Additionally, a number of special events and activities took place place near each of the streetcar stations, ranging from DJs to ballet dancers to sidewalk chalk artists. Many businesses along the route offered special streetcar-themed food, drinks, and merchandise.

The system initially opened with four out of the five streetcars in service, but the fifth was put into service around 4 p.m. on Friday and all five continued to operate for the remainder of the weekend. The system operated at nearly maximum capacity all weekend, with lines of people waiting to board at each station.

Unfortunately, the system was forced to close on Saturday afternoon due to a bomb threat. The threat, which appears to be connected to similar threats made over the weekend at the Cincinnati Zoo and two local high school football games, was not believed to be credible, but the system was closed down as a precautionary measure. After a bomb-sniffing dog searched all five streetcars and found nothing, they were put back in to service.

Despite this setback, the system transported passengers on 18,141 trips on Friday, 17,160 on Saturday, and 15,345 on Sunday, for a grand total of 50,646 trips during the grand opening.

After the free weekend, revenue service began Monday morning on the Cincinnati Bell Connector. The fare is $1 for a two-hour pass, or $2 for an all-day pass. No streetcar-specific monthly pass is available, but a monthly Metro pass includes rides on the streetcar as well as Metro buses. Tickets can be purchased at kiosks at each station, or using the Cincy EZRide app which is now available in the iOS App Store and Google Play.

Categories
News Transportation

System Designs Unveiled, Operating Agreement Reached for Cincinnati Streetcar

Officials with the City of Cincinnati and Southwest Ohio Regional Transit Authority (SORTA) made several major announcements last week pertaining to the rollout of the Cincinnati Streetcar system.

While the design of the rolling stock and the system’s color scheme were revealed more than a year ago, the official branding for the new mode of transit for the Cincinnati region had not. SORTA officials say that the branding will be utilized all throughout the system including its fare cards, ticketing machines, uniforms, wayfinding, brochures, website and social media, and, of course, the trains and their stations.

The branding scheme was put together by Kolar Design, whose offices are located in the Eighth Street Design District just two blocks from the nearest streetcar stop, after competing with more than 100 other firms interested in the opportunity to developing the design scheme.

Project officials say that the $25,000 cost for the branding effort was paid for through Federal funds.

Founders Club Card Sales
At the same time, SORTA and City officials announced the availability of 1,500 Founders Club Cards. The sale of the cards, officials said, would help raise some initial funds to be used to help offset initial operating expenses.

Project officials have informed UrbanCincy that approximately half of the 1,500 cards were sold within the first 24 hours of going on sale; and that more than 1,000 had been sold by Friday. A limited number of Founders Club Cards are still available for purchase at the Second Floor Cashier’s Office at City Hall, Metro’s sales office in the Mercantile Arcade across from Government Square, and online at Metro’s website.

There are three card options available. The first goes for $25 and allows for unlimited rides for the first 15 days of service, which is currently pegged for 2016. The second and third options go for $50 and $100, and allow for unlimited rides for the first 30 and 60 days, respectively.

The commemorative metal cards and matching metal cases were seen by some as one of the first ways for Cincinnati Streetcar supporters to show their support. Having experienced strong sales thus far, it seems as Metro’s strategy may prove to be a success.

“This is one of the first tangible opportunities streetcar enthusiasts can show their support,” said City Councilwoman Amy Murray (R), Transportation Committee Chair. “This is a great idea that Metro has developed to generate excitement. I think many will appreciate the privilege of being a Founding Club Member with this commemorative card.”

Operating Agreement Finalized
Perhaps lost amid the other news was the signing of an official operating agreement. Under the current structure, the City of Cincinnati is building the system, and is its owner, but will contract out its operations to SORTA.

The Cincinnati Streetcar Operating & Maintenance Agreement first came out of Murray’s Transportation Committee and was approved 7-2 by City Council in early November. It calls for expanded on-street parking enforcement in Downtown and Over-the-Rhine until 9pm, an increase in parking rates in those two neighborhoods, and a set streetcar fare of $1 for two hours.

The agreement also utilizes an innovative technique that would lower property tax abatements 7.5%. This is an important component of the agreement as it addresses a longstanding call from opponents for those benefiting from real estate valuation increases to cover more of the costs of modern streetcar system. It also eliminates the need to utilize the Haile Foundation’s $9 million pledge, and would instead only tap into those funds in a worst-case scenario.

Project officials estimate that the system will cost approximately $3.8 to $4.2 million annually to operate, and that those costs would be covered by $1.5 million in additional on-street parking revenue in Downtown and Over-the-Rhine, $1.3 million from fares and advertising, and an estimated $2 million annually from the tax abatement reductions.

“This is the most innovative plan I’ve seen in the United States,” stated John Schneider, noted transit advocate and real estate developer, at the time of City Council’s approval in November.

The SORTA Board approved the agreement last week and touted the benefits of having operations of the Cincinnati Streetcar be handled through Metro, which also runs the region’s largest bus service.

In addition to the critical financing elements of the agreement, it also delineates various responsibilities once service goes into effect. To that end, the City of Cincinnati will be in charge of maintaining traffic signals, clearing blockages from the streetcar path, cooperation on utility interfaces, safety and security; while SORTA will be responsible for operating the system, maintaining vehicles and facilities, fare collection provision and maintenance, marketing and advertising sales.

Construction on the $148 million first phase of the Cincinnati Streetcar continues to progress, with most track work in Over-the-Rhine now complete and track work now progressing through the Central Business District. Current time frames call for operations to begin in September 2016.

Categories
Business Development News Politics Transportation

Cincinnati’s Streetcar Victory a Decade in the Making

The final, final, final vote for the first phase of the Cincinnati Streetcar took place today. Perhaps by now you all know the outcome. A six-person veto-proof super-majority voted to continue construction. Cincinnati, as Mayor John Cranley (D) said today, will have a streetcar.

What is important in this moment is to realize that everyone involved lived up to their campaign promises. Wendell Young (D), Chris Seelbach (D) and Yvette Simpson (D) stood strong in their support of the project – even in the face of uncertain outcomes.

At the same time, Christopher Smitherman (I), Amy Murray (R) and Charlie Winburn (R) held true to their promises to oppose the streetcar no matter what. They were the three lone votes against restarting construction.

Construction work will soon resume on Cincinnati’s $133M streetcar project. Photographs by Travis Estell for UrbanCincy.

Then there are the three council members who campaigned on taking a serious look at the numbers and making a prompt decision about whether to cancel the project or proceed. P.G. Sittenfeld (D), David Mann (D) and Kevin Flynn (C) all did that once they saw the numbers in detail. Cancelling a project this far along would have been fiscally irresponsible, and they voted true to their campaign promises to be good stewards of the taxpayer’s dollars.

UrbanCincy has been covering this project since we started the website back in 2007. Our original coverage focused on redevelopment efforts in Downtown and then Over-the-Rhine, but the streetcar quickly became a big part of that redevelopment narrative. It is no secret that we are strong supporters of the project and believe it will improve mobility in the center city and set the city on a path toward building the regional rail system everyone seems to now desire.

There are many people responsible for getting Cincinnati to this stage, but the biggest credit must absolutely be given to John Schneider. If it were not for his unrelenting leadership on this issue over the past decade, we would not be anywhere close to where we are now.

The emergence of Mayor Mark Mallory (D) then gave the city a prominent leader to push the project forward, and Mallory leaned on the expertise and leadership of former City Manager Milton Dohoney and Vice Mayor Roxanne Qualls (D) to get it all done.

It is important to keep in mind that the person who first pushed for the Uptown extension to be included in phase one was in fact Roxanne Qualls. The Uptown Connector was never part of the original phase one plan, but was added in later as “Phase 1b” at the urging of Qualls, who then worked with Mallory and then Governor Ted Strickland (D) to secure state funding to make that happen.

Hard fought victories in 2009 and 2011 helped keep the project alive, but also delayed it and ran up the project’s costs. Those delays also allowed enough time for Governor John Kasich (R) to assume office and pull the $52 million in state funding Ohio had originally pledged.

So while Qualls’ leadership and vision to have the first phase include the Uptown Connector is not being realized at this exact moment, our attention must now turn to extending the streetcar line to neighborhoods in Uptown as quickly as possible.

Cincinnati Regional Rail Plan
The first phase of the Cincinnati Streetcar system is a small part of a much larger regional rail plan envisioned by leaders. Map provided by OKI Regional Council of Governments.

A new wave of leaders and organizers has emerged in Cincinnati as a result of this most recent battle over the streetcar project. This includes the heroic efforts of Eric Avner and the Haile/U.S. Bank Foundation for drumming up private support to contribute $9 million toward the project’s ongoing operations.

Their hard work and courage should certainly be commended, but let’s also not forget the people who have been pounding the pavement on behalf of the streetcar since the beginning. Most Cincinnatians in 2007 did not know what a streetcar was, much less a modern one and the benefits it would bring. The hard work put in by those people early on was necessary.

This movement was not built overnight and these supporters are not fair-weather fans of the city. The movement has grown in size and grown more sophisticated over the past decade and is now stronger than ever.

You too can join this urbanist movement in Cincinnati.

We gather at the Moerlein Lager House around the first Thursday of every month to host URBANexchange – an urbanist networking and social event. We also partner with the Niehoff Urban Studio at the University of Cincinnati to study complex issues facing our city and engage the public in that dialog. Please join us at our next URBANexchange and pay us a visit in Corryville for our next event with the Niehoff Urban Studio.

Now is a time to celebrate and reflect. But it is not the time to get complacent. There are more issues to address and this energy that saved the streetcar needs to be redirected there. Congratulations, Cincinnati! Let’s get to work.

Categories
News Opinion Transportation

GUEST EDITORIAL: Those “streetcar” rails going down on Elm Street are actually light rail tracks

Cincinnati Light Rail Tracks
The first light rail tracks were installed on Elm Street for the Cincinnati Streetcar on October 15, 2013.

A couple of years ago, an engineer designing our streetcar mentioned Cincinnati wouldn’t be installing the type of streetcar rail used in Seattle and Portland because that Austrian-made product doesn’t comply with “Buy America” requirements. He said not to worry, that the type of rail Cincinnati would be using would open up more possibilities for the future. I never thought much more about it …

… until a couple of weeks ago when I studied the end-profile of the rail they’re installing on Elm Street right now. I could see it wasn’t the streetcar rail I’m used to seeing in the Pacific Northwest. It was common “T” rail used on all kinds of rail systems across the country. So I called my engineer friend and others associated with the project, and sure enough, Cincinnati is building tracks through Over-the-Rhine today that can someday host light rail trains.

There is a similar story in Tacoma, which wants light rail to Seattle someday. Tacoma built its “streetcar tracks” to light rail specs and is now running streetcars similar to ours until the time is ripe for light rail. You can look it up: Google “Tacoma Link Light Rail”. You’ll see pictures of streetcars, not full-on light rail trains.

What Cincinnati is building on Elm Street today could easily become the light rail spine through the heart of the region, slicing diagonally across the downtown basin with seven Fortune 500 corporations, two-thirds of our region’s cultural institutions and thousands of potential new homes within a few blocks of the line.

Prowling around the web site of our streetcar-manufacturer, CAF, I found this. This is the Cincinnati Streetcar, which CAF calls a light rail vehicle (LRV). Cincinnati is buying five of these three-section Urbos vehicles shown here, but CAF makes five- and seven-section Urbos too. Even nine-section ones if you need to move enough passengers to fill a 747.

I asked around some more, and it turns out the engineers have also designed the radii of the curved track to accommodate longer trains. In order to run light rail on our streetcar line someday, we’d have to boost electrical power, change the signal wiring, and lengthen the platforms where the trains would stop. But those are small potatoes in the big picture.

You’ve heard it before, many times: “The streetcar doesn’t go anywhere,” or “I’m not crazy about the streetcar, what I really want is light rail.”

Cincinnati Light Rail Tracks on Elm Street
After new light rail tracks were installed in front of Music Hall, refurbished cobblestones were restored along Elm Street. Photograph by Travis Estell for UrbanCincy.

It doesn’t have to be this way forever. Using the Cincinnati Streetcar tracks now under construction, we could have light rail in the I-75 Corridor sooner rather than later. Cincinnatians who believe that rail is “just about downtown” need to look at this from 30,000 feet.

Here’s why. Our streetcars will travel north along Elm until they pass Findlay Market where they will turn east to head up the hill to UC. Longer, faster light rail trains can follow the same path on Elm, but turn west north of Findlay, head over to Central Parkway and then to I-75 where a rail corridor extending throughout Hamilton County is being preserved as part of the highway work now underway. That was a requirement of the I-75 Corridor Study, which found that a newly widened I-75 would attract many more cars and trucks by induced demand and that only the construction of light rail in the corridor would keep future freeway congestion in check.

The I-75 light rail might not always run alongside the highway; it probably can’t in some places. And anyway, the rail line probably wants to leave the highway here and there in order to penetrate neighborhoods and business districts where people live and work.

So our new mayor and city council can choose to cancel the Cincinnati Streetcar at great financial and reputational costs to our city. Or they can move forward and complete the project, allow Cincinnatians to become accustomed to using rail transit, and — when we’re ready to resume the community conversation on regional light rail — have the keystone building block in place. This is an important frame for the decision our city is about to make.

It’s a big decision, a defining moment for Greater Cincinnati. If we turn away from the expanded transportation choices in front of us now, we probably won’t have this chance again for a long time.

John Schneider is a local businessman who has long been an advocate for rail transit. In 2002 he helped lead the MetroMoves campaign and was instrumental in both Issue 9 and Issue 48 victories. He has personally led hundreds of Cincinnatians on tour of Portland’s streetcar and light rail system, and the development it has caused. Schneider is also the chairman of the Alliance for Regional Transit and sits on Cincinnati’s Planning Commission. If you would like to submit a guest editorial to UrbanCincy you can do so by contacting our editorial team at editors@urbancincy.com.

Categories
Business Development News Politics Transportation

MetroMoves: A Decade Later

The election held earlier this month marked the 10-year anniversary of MetroMoves, the Hamilton County ballot issue that would have more than doubled public support for the Southwest Ohio Regional Transit Authority (SORTA). Specifically, a half-cent sales tax would have raised approximately $60 million annually, permitting a dramatic expansion of Metro’s bus service throughout Hamilton County and construction and operation of a 60-mile, $2.7 billion streetcar and light rail network.

MetroMoves was SORTA’s third attempt to fund countywide transit service – sales tax ballot issues also failed in 1979 and 1980.


The 2002 MetroMoves plan called for five light rail lines, modern streetcars, and an overhauled regional bus system. Image provided.

Bus System Expansion
According to John Schneider, who chaired the MetroMoves campaign, SORTA planned to expand bus service immediately after collection of the tax began. In 2003 Metro’s schedule would have been reworked with more frequent service on every existing bus line, including more late night and weekend service. By 2004, with the arrival of newly purchased buses, Metro planned to link a dozen new suburban transit hubs with new cross-town bus routes.

The Glenway Crossing Transit Center, which opened in early 2012, is an example of the sort of suburban bus hubs planned as part of MetroMoves. The 38X bus, which began service when the transit center opened, is an example of the sort of new routes that MetroMoves would have funded.

Modern Streetcars & Light Rail Lines
In 2003 design work would have begun on a modern streetcar line and the first of five light rail lines. The streetcar line was planned to follow a route nearly identical to the line currently under construction in Downtown and Over-the-Rhine. The modern streetcar line was planned to have traveled up the Vine Street hill to the University of Cincinnati, then turn east on Martin Luther King Drive, cross I-71, and meet a light rail line on Gilbert Avenue.

Construction would have begun in 2004 and operation would have begun by 2006 or 2007.

The start date for light rail construction was less certain because the MetroMoves tax revenue was to be used as the local contribution for a large Federal Transit Administration (FTA) match. This process became standard practice in cities throughout the country since federal matching began in the early 1970s.


Modern streetcars, similar to those used in Portland, OR, could have been in service as early as 2005 had Hamilton County voters approved MetroMoves in 2002. Photograph provided by John Scheinder.

The first light rail line to be built was the system’s “trunk”, a line connecting Downtown and Xavier University on Gilbert Avenue and Montgomery Road. At Xavier, three suburban light rail lines were planned to converge on a trio of abandoned or lightly used freight railroad right-of-ways.

The first to be built would have been the northeast line through Norwood to Pleasant Ridge and Blue Ash. It was expected that the second line would be one incorporated into a rebuilt I-75; however that highway project has now been pushed back past 2020, meaning the Wasson Road line to Hyde Park likely would have been built soon after the line’s abandonment in 2009.

Renovating the Central Parkway Subway
Lost in the rhetoric employed to defeat MetroMoves was perhaps its most intriguing feature: a plan to renovate and at last put into use the two-mile subway beneath Central Parkway. This tunnel was built between 1920 and 1922 as part of the Rapid Transit Loop, a 16-mile transit line that would have connected Downtown with Brighton, Northside, St. Bernard, Norwood, Oakley, and O’Bryonville. Construction of the Rapid Transit Loop ceased soon after the Charterite ouster of the Boss Cox Machine and never resumed.

Three subway stations at Race Street, Liberty Street, and Brighton were to have been renovated and put into use as part of the 2002 MetroMoves plan. North of the subway’s portals, the line would have traveled on the surface to Northside, then entered I-74’s median near Mt. Airy Forest. Park & Ride stations were planned in the I-74 median at North Bend Road and Harrison Avenue/Rybolt Road in Green Township.

A fifth light rail line, requiring construction of four miles of new track, was planned to connect Northside and the Xavier University junction. Trains on this fifth line would travel from the far West Side to Hyde Park on the I-74 and Wasson Road corridors.

MetroMoves failure at the polls
MetroMoves was placed on the November 2002 ballot by SORTA in anticipation of a new federal transportation bill in 2003. What became known as SAFETEA-LU, a $286.4 billion measure, was not passed until 2005. Although SORTA’s board had the authority to place a transit tax on Hamilton County’s ballot in the years before the federal transportation bill was passed, MetroMove’s 2002 defeat was so lopsided (161,000 to 96,000 votes) that the regional transit authority choose not do so.

When speaking with those affiliated with the 2002 MetroMoves campaign, the failure of the ballot issue is usually attributed to four key factors:

  1. Anti-tax mood caused by the 1996 stadium sales tax and ensuing cost overruns
  2. 2001 Race Riot
  3. The MetroMoves campaign was thrown together quickly during summer 2002. SORTA’s board did not vote to place the issue on the ballot until August 20.
  4. A dirty opposition campaign comprised of Hamilton County Auditor Dusty Rhodes (D), Commissioner John Dowlin (R), Commissioner Phil Heimlich (R), and Congressman Steve Chabot (R).

The opposition campaign was led by Stephan Louis, who in late 2002 was reprimanded for false statements made during the campaign by the Ohio Elections Commission. Nevertheless, as a reward for his work in opposing MetroMoves, he was soon after appointed to SORTA’s board along with fellow public transit opponent Tom Luken in 2003.


Opponents to the 2002 MetroMoves campaign were accused and found guilty of using unethical campaign tactics. Newspaper image taken from a 2002 issue of CityBeat.

In 2006, Louis came under fire for having written racist and anti-public transportation emails and was forced off the board soon after. He reappeared to campaign in support of COAST’s anti-streetcar Issue 9 in 2009 and Issue 48 in 2011.

Another MetroMoves?
In 1972 when Cincinnati voters approved the .3% earnings tax that enabled creation of a public bus company, it was expected that city funding would be temporary and Hamilton County would eventually fund the region’s public transportation. Instead, nearly 40 years later, Cincinnati’s bus company is still funded only by the city and therefore provides only limited service outside city limits.

Ten years after the defeat of MetroMoves, despite a tripling of gasoline prices and the viability of transit systems proven by an increasing number of mid-sized American cities, it seems unlikely that a similar effort stands a chance of passage in Hamilton County in the immediate future. Many of the same public figures who opposed MetroMoves ten years ago have acted repeatedly in the past five to obstruct Cincinnati’s current streetcar project.

Furthermore, since the election of President Barack Obama (D) in 2008, the Tea Party has fomented an irrational suspicion of local government, and local anti-tax groups have authored intentionally misleading ballot issues. Meanwhile our local media, especially talk radio, continues to harass public transportation at every opportunity.

The way forward for the Cincinnati area has, since 2007, been the City of Cincinnati by itself. Despite the efforts of politicians, anti-tax groups, and utility companies to stop Cincinnati’s streetcar project, it broke ground in early 2012 and track installation will begin next year. Along with ongoing demographic shifts within Hamilton County, the success of Cincinnati’s initial streetcar might persuade the county’s electorate to approve county funding of public transportation for the first time.