Categories
News Transportation

PHOTOS: Cincy Red Bike Quickly Taking Shape Throughout City Center

Last week’s press conference on Fountain Square revealed a number of new details regarding Cincinnati’s new bike share system. In addition to unveiling the design of the bikes, stations and membership cards, officials also finally shared the system’s name – Cincy Red Bike.

Jason Barron, executive director of Cincy Red Bike, said that dozens of volunteers quickly assembled 260 of the bikes that will populate the initial 35-station system. Barron further clarified a point discussed in our analysis from just before the conference, and stated that each station will have between 13 and 19 docks, thus giving the system an initial docking capacity of 520 bikes. This would easily exceed the ideal 50% space contingency.

The press was also informed that the station at Union Terminal, which would have been a far off island from the rest of the initial system, has since been scratched for that very reason.

“Research indicated that having an island station like that is difficult for system balancing and that it typically does not get much use,” Barron told UrbanCincy. “An exception may be a park or someplace where people check out the bike ride it around the park and them check it back in.”

In terms of handling the balancing for such a large initial system, Cincy Red Bike will be utilizing a small van at first, but may add a trailer or a bike trailer to the balancing fleet at a later date depending on the system’s needs.

The process of getting a system like this operational so quickly comes with some challenges. While installing two to three new stations a day, officials are also still trying to work out the final membership and daily rates for users. Barron also says that the system map has changed some since initial releases, and that a new map will be released soon.

Those who want to stay up-to-date on the rapidly evolving system can do so now by following Cincy Red Bike on Facebook and on Twitter @CincyRedBike.

EDITORIAL NOTE: All 24 photos were taken by Breanna Tracy for UrbanCincy on August 16, 2014.

Categories
Arts & Entertainment News

PHOTOS: LumenoCity Showcases Music Hall’s Splendor for Second Consecutive Year

The wildly popular LumenoCity returned to Washington Park two weekends ago, and once again highlighted the splendor of Music Hall with a dazzling display of light, music and dance.

Each night included capacity crowds of anywhere between 12,000 to 20,000 people depending on reports. Each night had 12,000 official ticketed spots on the Washington Park lawn, but thousands of additional spectators lined up on nearby streets, balconies and rooftops. Additionally, the event was streamed live on the Internet and on local television.

The event also served as a critical campaign tool for those looking to put a sales tax on the November ballot to pay to renovate Union Terminal and Music Hall. However, it came as a huge surprise to most everyone involved and watching that Hamilton County Commissioners voted 2-1 to not approve the proposal as it was written, and moved forward instead with a plan that eliminated the spectacular Music Hall.

UrbanCincy contributing photographer, Brian Spitzig, was there on multiple nights shooting the event. The following video and 21 photos were taken over the course of that weekend.

Categories
Development News

PHOTOS: First Phase of Pendleton’s $26M Broadway Square Development Taking Shape

The first phase of Broadway Square in Pendleton is on schedule for completion later this fall. Recently, UrbanCincy had a chance to tour the construction of the project.

This is the first of three phases in the $26 million Broadway Square development. The buildings are being developed by Model Group, and the leasing of the retail and office space is being managed by Urban Fast Forward. Once completed, phase one will include 39 market rate apartments, 8,000 square feet of office and four retail spaces.

The development is located close to Horseshoe Casino and is adjacent to the recently renovated Spring Street Plaza & Playground and “multi-sensory and interactive” Spinnradl sculptures.

EDITORIAL NOTE: All 17 photos were taken by John Yung for UrbanCincy in late July 2014.

Categories
Business Development News

PHOTOS: The Changing Face of Downtown Cincinnati

It’s not just housing that’s booming in the center city, there is also a slew of office, retail, hotel and infrastructure projects underway that are transforming Cincinnati’s skyline and its streetscapes.

All of the construction activity makes it feel as if there is work taking place in just about every corner of the central business district and its immediate surroundings. And for the most part, that feeling is valid.

In addition to the thousands of residential units under construction, work is also currently underway on the second phase of The Banks, which will include not only 300 additional apartments, but also General Electric’s new North American Global Operations Center, 313-room Renaissance Hotel, dunnhumbyUSA Centre, Mabley Place, reconstruction of Second Street, and work is about to get underway for the new 115-room Holiday Inn hotel at Seventh and Broadway Streets.

In addition to all of the construction work taking place, the weather earlier this month was terrific and made for a perfect time to take pictures of some of the center city’s beauty.

EDITORIAL NOTE: All 22 photos were taken by Travis Estell for UrbanCincy between July 2 and July 9, 2014.

Categories
Development News

PHOTOS: Construction Progressing on Thousands of New Downtown Residences

Six months ago, we reported on 11 residential developments moving forward in the Central Business District, Over-the-Rhine, and Pendleton. At the time, these were expected to add about 1,500 new units of housing to the urban core. Although one of these projects has been downsized and another postponed, one new residential project was announced as well.

Most notably, the proposed tower at Fourth and Race was downsized from 300 to 200 units, and the grocery store that would have been located on the ground floor of the building has been dropped from the plan.

The Cincinnati Center City Development Corporation (3CDC) is also shelving its plans for a new mixed-use project at 15th and Race, which would have added 57 residential units. However, 3CDC is also shelving its plan to build 53,000 square feet of office space as part of the third phase of Mercer Commons, and is considering building more residential at that location. The first two phases of Mercer Commons contain 126 apartments and 28 condos in addition to retail space.

Finally, the proposal to bring an AC Hotel to the former School for the Creative & Performing Arts (SCPA) in Pendleton has been scrapped. Developers are now moving forward with an alternate plan, which will convert the building into 155 market-rate apartments.

The other projects still moving forward include:

  • Phase two of The Banks broke ground in April 2014. It will contain 305 new apartments and 21,000 square feet of retail space, in addition to a new office tower for General Electric.
  • AT580, formerly known as the 580 Building, is being converted from office space into 179 apartments. The existing retail spaces on the first and second floors will remain.
  • The Seven at Broadway project will feature 110 high-end apartments, built above an existing parking garage. The target demographic for these units will be empty-nesters and older professionals looking for downtown living, according to Rick Kimbler, partner at the NorthPointe Group.
  • Broadway Square, a $26 million development, is now under construction in Pendleton. Its first phase will feature 39 apartments and 40,000 square feet of retail space, and developer Model Group will add at least another 39 apartments in the second phase of the project.
  • The Schwartz Building, formerly vacant office space, is being converted into 20 apartments. Developer Levine Properties cited the building’s location along the Cincinnati Streetcar route as a driving factor for the renovation.
  • The Ingalls Building will be redeveloped into 40 to 50 condos and ground-floor retail space by the Claremont Group.
  • Peak Property Group plans to purchase and renovate three buildings on Seventh Street into 75 apartments and 15,000 square feet of retail space.
  • Developers of the Fountain Place retail building want to add 180 to 225 residential units above the existing Macy’s department store.

EDITORIAL NOTE: All 12 photos were taken by Travis Estell for UrbanCincy between July 3 and July 8, 2014.